Floodway
1% (100-year) Floodplain
0.2% (500-year) Floodplain

Open Channels

This map is showing estimated future floodplain maps based on a CLOMR.
> View Effective Floodplain Map
Project Brays Benefits
Upon its completion, Project Brays will provide a 1 percent (100-year) level of protection along the main stem of Brays Bayou upstream of Beltway 8. After the construction of all elements of Project Brays, the area downstream of Beltway 8 will see the removal of the 1 percent (100-year) floodplain from 15,000 homes/businesses in the Brays Bayou watershed.
An interactive mapping tool of the Harris County Flood District